Our
Process
-
Clean & Degrease
Doors and drawers are removed and taken back to our shop to be cleaned and degreased. This important step ensures proper adhesion of primer.
-
Sanding
Prior to spraying the primer, all surfaces are scuff sanded, vacuumed and a tac cloth is applied to remove any dust to prepare for a perfect spraying surface.
-
Masking
On-site, the entire kitchen is masked off. Cabinet openings, countertops, floors and all appliances are covered with plastic film. A dust containment wall is erected and an air scrubber is used for ventilation.
-
Spraying
All surfaces are sprayed and receive two coats of 2k poly primer and two coats of 2k poly topcoat. This is a professional coating made specifically for refinishing and leaves a smooth, durable factory finish.
-
Reinstall Doors
On the final day, all doors and drawers are reinstalled. Installation of new hinges and handles is also an option.
What Our Clients Say